Go top
Project information

Methods and Time Analysis of a Carton Box Production Line

P. Sánchez A. Ramos R.R. Pecharromán

July 2004 - October 2004

Funding entity Microlan S.A.


This project consists of improving production capacity of a carton production line. This production line contains a Masterflex 160 A impression machine. To achieve this improvement three mains aspects are going to be analyzed:

- Methods and Time Study on order change process
- Development of a software tool to analyze change process tasks between two consecutive orders
- Production capacity analysis based on type of orders


Masterflex